Renovation Day #9 – #10

Renovation progress slowed down for a couple days. However today (Wednesday)  the “mudders” came to apply the first coat of  gyproc mud to the drywall. Well it wasn’t quite that easy; first off one of them had to finish putting up sheets of gyproc in the linen closet and then he worked at matching up the new drywall with the existing plaster board. The other fellow applied copious quantities of drywall mud to all areas that required it. At the end of the day everything is starting to take shape….. see attached pictures.
img_4880

Main Bathroom First Coat

img_4882

New Linen Closet

img_4884

Walk-in Closet first coat

img_4883

Walk-in Closet first coat

October 28, 2009   No Comments

Renovation Day #8

Today was the start of the drywall work. A crew of 2 showed up this morning and within a couple hours were done and gone. We are now waiting for the “Mudder” to show up. Hopefully that should be tomorrow sometime and then after that it will be sanding, finishing, etc. etc. Pictures are attached and you can start to see the size of the Main Bathroom and the Walk-in Closet…….. it’s going to be great.

img_4876
Main Bathroom where Vanity and Toilet will be located
img_4877

Main Bathroom Tub/Shower

img_4878

Walk-in Closet

img_4879

Walk-in Closet another view

October 26, 2009   1 Comment

The Boys from P.G. Trip to Vancouver

Our Nephew Brent and his son Colin visited Maureen and Art in White Rock so they could drive in and see a Vancouver Canucks versus Toronto Maple Leafs hockey game. Colin is a huge Maple Leafs Fan and you’ll see by the picture attached that the Boys have been equipped with all the necessary apparel for tonight’s game. GO LEAFS!!!!!img_05421

How the heck did these pictures get on our Silly Blog????toronto-maple-leaf-joke1
Brent’s Class Photo from 1978 – perhaps this is were Colin gets it from?
1967leafs_feature

1967 Toronto Maple Leafs - Stanley Cup Winners!

leafs
Enough Said!!!!!!

October 24, 2009   2 Comments

Renovation Day #7

Not a whole bunch of activity today. The contractor stopped by to pick up another load of garbage and waste. I insulated some additional areas that were opened up and made an interesting discovery. The water line to the outside front tap was right against the stud and could have easily been damaged from a nail when doing the finishing mouldings. So, I shut off the water, drained the line and cut the pipe in the floor joists and removed the copper pipe and external tap. When the plumbers are back to complete all the hook ups we will have them install a new frost free type external tap. Finally all the gyproc board was delivered and inside for the drywallers to get started on Monday.

October 24, 2009   No Comments

Renovation Day #6

Progress today was a little slower, but everything is certainly starting to take shape. A carpenter was back to prep the floor and wall areas for the installation of Gyproc Board and to strengthen and level the floor area in the walk-in closet. Sounds like the drywallers will be here on Saturday to get started, so next week we should see some real changes. Pictures to date are attached below. img_4873img_4874img_4875

October 22, 2009   4 Comments

Renovation Day #5

Today was Electrical Installation/Addition Day. The majority of the electrical work is complete and the electricians won’t be back until it’s time to do the final hook up of lights, heated floors, switches, etc. Today’s work included installation of new light switches and boxes in the main bathroom and walk-in closet, wiring for vent fan and the big job was running 240V for the installation of  a heating pad for the travertine tile floors. We also had them wire a new plug-in for the T.V. and re-route the cable for the T.V. so we can do a wall mount for our flat panel LCD. The two guys we had working today were the very accommodating and work their tails off to get all the work completed in a short time! Pictures below.img_4870img_4871img_4872

October 21, 2009   No Comments

Renovation Day#4

Lots of progress today. Plumbing is finished for now and the plumbers won’t be back until it’s time to install the Vanity Sink and Toilet. The drains are all in place, the ceiling in Walk-in Closet is framed in, the 1 piece tub installed and new insulation has been added on the external walls. We think the worst part of dust and demolition is behind us…………. well at least until the drywallers arrive! See pictures below.img_4867img_4868img_4869

October 21, 2009   No Comments

Renovation Day #3

Renovations are ongoing and we believe this is the end of the really messy stage of demolition and we are close to the stage when construction can begin. Today was plumbing day and the two young guys that worked on it really earned their pay. The original piping was all cast iron for drainage and it is bulky, awkward, tough and heavy; oh and of course it is through 2 floors and into the attic and was a real challenge. I have attached some pictures which probably won’t do the job justice. Anyway, we are almost finished the plumbing. There are all new drains, new water lines and the 1 piece tub/shower unit is sitting in the middle of the bathroom. They have a little more work to do tomorrow and we’ll be ready for the carpenters to start their work.
img_4863

 

img_4864

New drain lines for Vanity

img_4865

Finally starting to look like a walk-in closet.

.

October 19, 2009   No Comments

Main Bathroom Renovation

As promised I am attaching some pictures of our home renovation underway which includes painting the living room, spare bedrooms, main bathroom upgrade and addition of a walk-in closet off the master bedroom. A little background; we were looking at painting the living room, spare bedrooms and upgrading the bathroom. A consultant we had through the house suggested that we could do everything we wanted, however with a little more work (of course a few more dollars) we could cut the main bathroom in about half and add a walk-in closet to the master bedroom. We were given a great reference on a quality contractor “HKR Builders” (a fate would have it the contractor was a fellow that formerly worked at the pulpmill and left it to start his own Company about the time I left in 2006). Anyway pictures are attached and we will update as work progresses!
img_48331
img_4854

View from Master Bedroom towards walk-in closet location.

 

img_4856
View from hallway to new walls in main bathroom.
img_4859

View from Master Bedroom towards door jamb on new closet. Yes the plumbing will be relocated.

October 17, 2009   No Comments

It’s Been a While – Lots is Happening

Yes it has been a while since we have posted, well that is about to change. Golf has been pretty good, except for a couple days weather has been not bad to excellent and we have only been blown off the course (wind, rain, snow flakes) two days so far in October. We survived the recent cool spell (down to -9C) and I believe so did our sprinkler system; the sprinkler guy is coming early next week to blow it out for the winter season. Kevin and Tamara are settling in to family life with Sage and Conrad (the two cutest grand-kids in the world). They have started a major addition to their home and are adding a garage where the carport was. Unfortunately they have been without gas (so no heat and hot water) for over a week and it looks like it will  be another week until Terasen gets it hooked up. Jeff and Lindsay are as busy as ever and Lindsay just finished a week long (more like a year long preparation) International conference hosted by Cybera on Grid Computing; it was a true International Event with conference delegates from around the world attending. We heard that she did an excellent job…. Way To Go Lindsay! Around here we have been busy with Curling season getting underway. Brenda is giving it try for a first time with the Thursday Ladies League; I know she will do real well. I am curling with Monday Seniors Select and will spare if I get calls. In other news we are starting a main bathroom renovation which will include adding a walk in closet in the master bedroom and we will also be painting pretty well the whole main level. We’ll provide updates and pictures as the work progresses!

October 17, 2009   No Comments